Containment Netting

Installation of netting can resolve a number of problems.

Multiple Work Parties

A common issue during shut down periods is the need for a large number of contractors to work in the same area.

Production or drilling shut downs are highly expensive and ideally all contractors involved in annual maintenance would be able to work at the same time – however there is an obvious risk caused by conflicting activities.

During the North Alwyn Drilling shut down in June 2010, Axiom successfully installed vertical and horizontal netting to protect personnel outside the derrick and on the drill floor whilst work took place at height inside the derrick.

The end result was a considerable saving in time and money for our client.

Installation of containment nettingRope Access Installation of NettingWe believe that Axiom is one of very companies to have made this idea work in the field and we are very well placed to deal with similar requirements in the future.

Work Positioning Netting for Under Deck Access

The same type of netting can be installed in a different fashion to allow rapid access to under deck areas by multiple work parties – after initial installation by the rope access team, the nets provide a work platform that is easily accessible to less specialist personnel.

Work Positioning Nettingnetting with debris net overlayWork positioning netting (WPN) and WPN with debris net overlay seen from below

 

Visit our Resource Area to find out more about netting standards, applications and our supplier

Industry News

[Press] Subsea 7 Awarded Contracts Offshore Norway

Luxembourg - 15 December 2017 - Subsea 7 S.A. (Oslo Børs: SUBC, ADR: SUBCY)today announced the awar ...


[Press] Aker BP Submitted Plans for Development and Operation (PDOs) for Three Projects

Today, Aker BP submitted Plans for Development and Operation (PDOs) for three projects. The total i ...


[Opinion] Bakken Gas Threatens Crude Production

The output of associated gas in two counties within the Bakken core has already exceeded local proce ...


[Press] Micro-Cap Oil & Gas Explorer's First Permian Basin Well Flowing 465 Barrels/Day

Exploration is just beginning for this oil and gas E&P with large tracts of prime land in the Permi ...


[Press] Petrobras and ExxonMobil Form Strategic Alliance

Petrobras and ExxonMobil  have signed a memorandum of understanding regarding a strategic alliance ...


Read more news

Accreditations